Manpower Log
SOUTH CENTRAL RAILWAY
Daily uses of type and quantity of consumables of environmental sanitation, mechanized cleaning and housekeeping contract at Sabarmati Railway station
| Shift | Description | To be provided as per norms |
Provided by contractor ( as per bio-metric attendace sheet) |
Found absent during the shift check |
Actual avaliable | Found without dress code & ID cards |
Found without protective gears |
Signature of On duty CHI |
|---|---|---|---|---|---|---|---|---|
| General (Round the clock) |
Project Manager | 0 | 1 | 0 | 1 | 0 | 0 | CHI Shift 1/2/3 (S NAGARAJU) |
| Total | 0 | 1 | 0 | 1 | 0 | 0 | ||
| General (Round the clock) |
Driver | 0 | 1 | 0 | 1 | 0 | 0 | CHI Shift 1/2/3 (S NAGARAJU) |
| Total | 0 | 1 | 0 | 1 | 0 | 0 | ||
| General (Round the clock) |
Pest Control | 0 | 1 | 0 | 1 | 0 | 0 | CHI Shift 1/2/3 (S NAGARAJU) |
| Total | 0 | 1 | 0 | 1 | 0 | 0 | ||
| Shift 1 | Supervisor | 0 | 2 | 0 | 2 | 0 | 0 | CHI Shift 1 (S NAGARAJU) |
| Housekeeper | 0 | 41 | 0 | 41 | 0 | 0 | ||
| Total | 0 | 43 | 0 | 43 | 0 | 0 | ||
| Shift 2 | Supervisor | 0 | 2 | 0 | 2 | 0 | 0 | CHI Shift 2 (S NAGARAJU) |
| Housekeeper | 0 | 28 | 0 | 28 | 0 | 0 | ||
| Total | 0 | 30 | 0 | 30 | 0 | 0 | ||
| Shift 3 | Supervisor | 0 | 1 | 0 | 1 | 0 | 0 | CHI Shift 3 (S NAGARAJU) |
| Housekeeper | 0 | 9 | 0 | 9 | 0 | 0 | ||
| Total | 0 | 10 | 0 | 10 | 0 | 0 | ||
| Grand Total | 0 | 86 | 0 | 86 | 0 | 0 | ||
Signature of Contractor Representative
CHI IN Charge